Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 3years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We are Supplier and Manufacturer all kinds of scaffolding systems, scaffolding accessories, formwork systems, concrete machines, construction machines and construction tools.
a.Your inquiry related to our product & price will be replied within 24hours.
b.Well-trained & experienced staffs are to answer all your inquiries professional in English of course.
c..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
d.Excellent quality and Competitive price,OEM is highly welcomed.We have strong R&D team here to help.
e.Less than one container loading is accepted
f.On time delivery, in general 25-40 days.
g.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.
Q345 steel Layher all round ringlock scaffolding,construction scaffolding for USA
Building Material Supplier For Ringlock Scaffolding from China
Ringlock scaffolding, also called Modular Scaffolding and Multidirectional Scaffolding, the junction enables quick and easy connection of load bearing items as well as reinforcing parts to each other with an enormous rigidity.
Ringlock scaffolding is the new generation product of cuplock sacffolding.there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately.
Product Name
|
Building Material Supplier For Ringlock Scaffolding from China |
Guangdong China
|
|
Tube diaeter
|
48mm
|
Tube thickness
|
3.0/3.25mm
|
Vertical tube length
|
500/1000/1500/2000/2500/3000mm or OEM
|
Ringlock Scaffold Material
|
Q235 steel
|
Surface Treatment
|
Galvanized,Dip Painting,Powder coated
|
Color
|
Orange or Any color
|
Certificate
|
SGS,CE,ISO9001
|
Service
|
ODM OEM Service
|
MOQ
|
50pieces
|
Payment
|
T/T.L/C
|
Delivery Time
|
About 20-30 days after confirmation
|
Packing
|
in bulk or steel pallet or as your request
|
production capability
|
100 tons per day
|
Manufactory Location
|
Foshan,China.
|